It was a quieter week, with minimal work being done as we waited to see what was under the cement slab found while digging last week. Here is a quick recap of what took place:

  • Builders for Christ brought their work trailer and set up water and sewage lines for their campers. If you look at the picture of the trailer door you can see all the places it has been. Soon Mt. Olive will be added to that list!
  • The water and sewage lines as well as the trailer now block off the upper lot from the lower lot. So please be aware that you will have to arrive and leave out of the same exit.
  • A fourth camper was set up in the upper parking lot.
  • Friday the cement slab was dug out and a remnant of a gas tank was found. Testing of the ground was done to check for any contamination that may have happened from the gas tank that was previously there.

Below are a few pictures from the week.